Premium Extension Specialists Across London & the South
Transform your home into something extraordinary
AQ Group delivers award-winning extensions, loft conversions and full renovations across London, Cambridge, Oxford, Herefordshire and the Home Counties — on time, on budget, built to last.
£10M Insured
200+ Reviews
CIS Registered
15 Years Experience
Rear Extensions
Loft Conversions
Basements
Full Renovations
Side Returns
Conservatories
Structural Works
Free Quotes
Rear Extensions
Loft Conversions
Basements
Full Renovations
Side Returns
Conservatories
Structural Works
Free Quotes
What We Build
Every extension, perfected
Rear Extensions
Single and double storey rear extensions that open your ground floor to light and space — from kitchen-diners to open-plan family rooms.
Loft Conversions
Transform your unused loft into a stunning master suite, home office or guest room. Velux, dormer, hip-to-gable and full mansard — all in-house.
Basement Conversions
Unlock the hidden potential beneath your home. Full excavation, structural waterproofing and luxury fit-out — home cinemas, gyms, bedrooms and more.
Side Return Extensions
Reclaim the narrow passage beside your Victorian terrace. Side returns dramatically widen your kitchen and flood the space with natural light.
Kitchen Renovations
Complete kitchen transformations from layout redesign and structural wall removal to full supply and installation of fitted kitchens in any specification.
Bathroom & En-Suites
Luxury bathroom renovations, en-suite installations and wet rooms. Full supply and fit including tiling, sanitaryware and underfloor heating.
Full Renovations
Complete property transformations — structural changes, layout reconfigurations, full fit-out. One team, one contract, zero headaches.
Conservatories & Orangeries
Contemporary glass extensions that connect your home to the garden. From aluminium conservatories to bespoke brick orangeries with roof lanterns.
200+
Completed Projects
£10M
Insured Value
15
Years Experience
4.9
Average Rating
Instant Pricing
Know your budget before you call
Use our London extension cost calculator to get a realistic price range in under 60 seconds. Select your type, size and specification for a full cost breakdown.
Estimated project cost
£68,000
— £82,000
Rear single storey · 28m² · Premium · Inner London
Why AQ Group
Built on trust, delivered with precision
01
Fixed-price contracts
No surprise bills. We provide detailed specifications upfront and stand behind every quote we give you.
02
Dedicated project manager
Your single contact from first survey to final sign-off. You will never need to chase us for updates.
03
Structural expertise in-house
Qualified structural engineers on our team — no subcontracting, no passing the buck, ever.
04
10-year structural warranty
Every project carries a decade of structural guarantee backed by our insurer for your peace of mind.
How It Works
From first call to finished project
1
Free Survey
We visit your home, understand your vision and discuss options at no cost or obligation whatsoever.
2
Detailed Quote
A comprehensive fixed-price quote with full scope and timeline, delivered within 5 working days.
3
Permits & Design
We handle planning permission, architect drawings and building regulations on your behalf.
4
Build & Complete
Your project built by our directly employed team — on time and to the very highest standard.
Our Work
Recent projects
Kitchen Rear Extension
Wandsworth · 2024
Loft Dormer Conversion
Hackney · 2024
Open-Plan Side Return
Islington · 2023
Kitchen Renovation
Chelsea · 2024
Wrap-Around Extension
Bromley · 2023
Master En-Suite Bathroom
Richmond · 2024
Client Reviews
What our clients say
4.9
★★★★★
200+ reviews
Checkatrade & MyBuilder
S
Sarah Mitchell
Wandsworth, London
★★★★★
"AQ Group transformed our Victorian terrace with a stunning rear extension and side return. The project took 14 weeks — exactly as promised. Exceptional craftsmanship throughout."
Checkatrade · Rear Extension
J
James & Claire Obi
Hackney, London
★★★★★
"Our loft dormer conversion has completely changed how we live. Beautiful finish, no mess left behind, and their project manager kept us updated every single day."
MyBuilder · Loft Conversion
R
Rachel Thompson
Islington, London
★★★★★
"From the first survey to final walkthrough, AQ were professional, transparent and genuinely skilled. Our basement conversion is now our favourite room in the house."
Google · Basement Conversion
Transparent Pricing
Clear prices, no surprises
All prices include labour, materials, project management and site clearance. Planning fees and building regulations quoted separately.
Standard
Functional & Reliable
From
£1,800
per m² · rear extension
Block & render or brick finish
UPVC or aluminium windows
Tiled or laminate flooring
Standard kitchen & bathroom
LED lighting throughout
★ Most Popular
Premium
Quality & Character
From
£2,200
per m² · rear extension
Brick or zinc cladding finish
Bifold or sliding doors
Engineered timber flooring
Fitted kitchen & quality appliances
Underfloor heating option
Roof lantern option
Luxury
High-End & Bespoke
From
£2,800
per m² · rear extension
Natural stone or copper cladding
Crittall-style steel glazing
Marble or bespoke timber floors
Designer kitchen & bathroom
Full underfloor heating
Smart home automation
Ready to Start?
Your dream extension, wherever you call home
Book a free, no-obligation site survey. We visit your home, listen to your vision and present honest options with no pressure.
07448174077
Our Services
Everything you need, under one roof
From planning permission to final paint, AQ Group manages your entire project in-house — no subcontractors, no hidden costs, no surprises.
Most Popular
Rear Single & Double Storey Extensions
The most transformative change you can make to a London home. A rear extension opens your ground floor to light and space, creating the kitchen-diner or open-plan family room your family deserves. We handle every stage in-house, from the first structural calculations to the final coat of paint.
From 15m² to 80m² — any size handled
Glazed rear walls, roof lanterns, bifold doors
Structural calculations included in-house
Planning and permitted development managed
Typical timeline: 10–20 weeks
£1,800 — £4,000 per m²
Standard to luxury spec · outer to central London
High ROI
Loft Conversions
Transform dead space above your head into one of the most desirable rooms in your home. A well-executed loft conversion adds 20–25% to your property value and provides a completely private retreat for the whole family.
Velux, dormer, hip-to-gable, mansard options
En-suite master bedrooms, home offices, studios
Staircase design and installation included
Structural strengthening of floor joists
Typical timeline: 8–14 weeks
£40,000 — £110,000 fixed range
Dormer and mansard conversions at the higher end
Terraced Homes
Side Return Extensions
Perfect for Victorian and Edwardian terraces, side return extensions reclaim the narrow passage running alongside your home to dramatically widen your kitchen and flood the space with light from a glazed or lantern roof.
Typically adds 4–6 metres to kitchen width
Glass or roof lantern above for maximum light
Party wall agreements handled on your behalf
Can be combined with rear extension
Typical timeline: 10–16 weeks
£2,000 — £4,500 per m²
Structural complexity and access affect pricing
Maximum Space
Basement Conversions
Where upward and outward expansion is not possible, going below ground is your answer. We excavate and convert basements into luxurious living spaces — from home cinemas and gyms to additional bedrooms with full natural light.
Full excavation and underpinning expertise
Structural waterproofing (tanking) specialists
Natural light via lightwell or glass floors
HVAC and ventilation design included
Typical timeline: 20–36 weeks
£2,500 — £7,000 per m²
Ground conditions and depth significantly influence cost
Complete Transformation
Full Property Renovations
When a property needs everything, AQ Group takes it from shell to spectacular. We manage structural changes, layout reconfigurations and high-end fit-out as a single seamless project with one point of contact throughout.
Strip-out, structural alterations and rewiring
Full plumbing and heating replacement
New kitchen, bathrooms and joinery throughout
Decoration and flooring to your specification
Single project manager for the entire build
£800 — £2,500 per m² of property
Scope of work and specification drive the final figure
Garden Connection
Conservatories & Orangeries
Beautifully designed glass extensions that create a seamless connection between your home and garden. From sleek aluminium conservatories to traditional brick orangeries with dramatic roof lanterns that fill every corner with natural light.
Slimline aluminium or thermally broken steel frames
Solar control and self-cleaning glass options
Roof lanterns, ridge glazing, full glass roofs
Underfloor heating as standard recommendation
Typical timeline: 6–12 weeks
£1,400 — £3,500 per m²
Glazing specification and structural complexity
Heart of the Home
Kitchen Renovations & Extensions
Complete kitchen transformations managed entirely in-house. Structural wall removals, full electrical rewire, plumbing reconfiguration and fitted kitchen supply from standard to fully bespoke. Often combined with rear or side return extensions for the ultimate open-plan kitchen-diner.
Full kitchen design & layout planning
Structural wall removal option
Supply & fit from £15,000 to £120,000+
All appliances supplied, installed & commissioned
Typical timeline: 3–10 weeks
£15,000 — £120,000+
Depending on size, specification and structural changes
Luxury & Functionality
Bathroom Renovations & En-Suites
From complete bathroom refurbishments to brand-new en-suite installations in loft conversions, AQ Group manages every detail: full strip-out, waterproofing, plumbing, tiling, sanitaryware supply and underfloor heating. Your bathroom transformed in 2–8 weeks.
Full waterproofing to BS 5385
Plumbing reconfiguration & new drainage
Wet rooms, walk-in showers, freestanding baths
All tiles, sanitaryware & accessories supplied
Typical timeline: 2–8 weeks
£8,000 — £65,000
Standard refresh to luxury master bathroom suite
Not sure which service you need?
Book a free consultation. We visit your home, understand your goals and recommend the best solution for your property and budget — no pressure, no hard sell.
Instant Pricing Tool
London Extension Cost Calculator
Get a realistic, detailed estimate for your extension in under 60 seconds. Uses current 2026 market rates for London, Cambridge, Oxford and surrounding areas.
2026 London & regional rates
All extension types
Full cost breakdown
Timeline estimate
1. Extension type
What type of extension are you planning?
■
Rear Single Storey
From £1,800/m²
■■
Rear Double Storey
From £1,600/m²
↦
Side Return
From £2,000/m²
↩
Wrap-Around
From £1,750/m²
△
Loft Conversion
From £40,000
▽
Basement
From £2,500/m²
2. Floor area
How many square metres do you want to add?
Extension size30 m²
10 m²80 m²
3. Your location
Labour and material costs vary across regions. Select your nearest area.
Outer London & Home Counties
Zones 3–6 · Also: Cambridge, Oxford, Herefordshire
Inner London
Zones 1–3 · Hackney, Wandsworth, Islington, Richmond
Select any additional features to include in your estimate.
✓
Bifold / Sliding Doors
+£3,500–6,500
✓
Roof Lantern
+£2,500–5,000
✓
Underfloor Heating
+£80–130/m²
✓
New Kitchen
+£12,000–28,000
✓
En-Suite Bathroom
+£8,000–16,000
✓
Smart Home System
+£3,000–9,000
✓
Planning & Arch Fees
+£4,000–8,000
✓
Party Wall Agreement
+£1,000–2,500
Estimated project cost
£54,000 — £72,000
Based on 2026 market rates for your region
10–16
weeks build
30 m²
floor area
Premium
spec level
Cost Breakdown
Groundworks & Foundation—
Structure & Roof—
Windows & Glazing—
Internal Fit-Out—
Plumbing & Electrical—
Professional Fees—
Selected Add-ons—
Mid-point estimate
£63,000
This estimate is a guide based on current regional market rates. Actual cost depends on site conditions, access and detailed design. A free survey gives you an accurate fixed price.
Our Projects
200+ projects across the UK
From side returns in London to full basement conversions in Cambridge and loft conversions across Oxford and Herefordshire — every project delivers flawless results.
Rear Extensions
Loft Conversions
Kitchen Renovations
Bathroom & En-Suites
Full Renovations
Rear Extensions
Loft Conversions
Kitchen Renovations
Basement Conversions
Bathroom Renovations
Rear Extension
Open-plan kitchen-diner
Wandsworth · 42m² · Premium
Loft Conversion
Dormer master suite
Hackney · Dormer · Luxury
Side Return
Victorian terrace kitchen
Islington · 18m² · Premium
Full Renovation
4-bed complete refurb
Chelsea · Full property · Luxury
Rear Extension
Double storey addition
Bromley · 58m² · Standard
Basement Conversion
Cinema & gym
Kensington · 80m² · Luxury
Loft Conversion
Hip-to-gable with en-suite
Richmond · Hip-to-gable
Kitchen Renovation
Complete kitchen redesign
Lewisham · Full kitchen
Side Return + Rear
Wrap-around ground floor
Stoke Newington · 38m²
Your project could be our next showcase
Ready to add your home to our portfolio? Book a free survey and let's talk about what's possible for your property.
About AQ Group
Building exceptional homes for 15 years
Founded in London with a commitment to honest pricing, clean sites and craftsmanship that stands the test of time. Now serving clients across London, Cambridge, Oxford, Herefordshire and the Home Counties.
2009
Founded in London
Our Story
Expertise built over 15 years in London
AQ Group was founded in 2009 with a single belief: that homeowners deserved a construction company that treated their home with the same care they did. From our London roots, we now complete projects across Cambridge, Oxford, Herefordshire and the Home Counties.
What sets us apart is not just our craftsmanship — it is our honesty. We give you a fixed price and we stick to it. We give you a timeline and we hit it. Our project managers keep you informed every step of the way, and our team treats your home like their own.
We are CIS registered, carry £10 million public liability insurance, and every project is backed by a 10-year structural warranty. Based in London, we serve clients across Cambridge, Oxford, Herefordshire and all Home Counties.
CIS Registered
£10M Insured
Checkatrade Approved
MyBuilder Verified
10-Year Structural Warranty
Building Regs Compliant
Our Values
How we build, and why it matters
Precision
Every measurement, every joint, every finish. We take pride in the details that most people never see — because we know they make all the difference.
Honesty
We say what we mean and mean what we say. Fixed prices, honest timelines, clear communication. If something changes, you will know immediately — not at the end.
Accountability
We stand behind our work for ten years. If anything structural fails due to our work, we come back and fix it. No arguments, no delays, no questions asked.
Respect
Your home is your sanctuary. We work quietly, we clean up daily, we protect what matters to you. Living through a build is hard enough without contractors making it worse.
Speed
Time is money, and it is yours. We build at pace without cutting corners — because the faster you have your new space, the sooner your life improves.
Sustainability
We specify energy-efficient insulation, responsible sourcing and waste reduction on every project — because building better means building greener.
Ready to work with London's best?
Book your free site survey and discover what AQ Group can do for your home.
Contact AQ Group
Let's talk about your project
Book a free, no-obligation site survey and receive a detailed fixed-price quote within 5 working days. No pressure, no hard sell.
Get In Touch
Free survey, fixed-price quote
Phone
07448174077
Mon–Fri 8am–6pm, Sat 9am–1pm
Email
aqgroup.uk@gmail.com
We reply within 2 working hours
Service Area
London, Cambridge, Oxford & Herefordshire
All London boroughs · Cambridge · Oxford · Herefordshire · Surrey · Kent · Essex
200+
Projects
4.9★
Rating
£10M
Insured
Get a free quote
Tell us about your project and we will arrange a free site survey at a time that suits you. No obligation, no pressure, no hard sell.
Your details are never shared. We reply within 2 hours.
Single and double storey rear extensions are the most powerful way to add space and value to a London home. AQ Group delivers stunning open-plan spaces, kitchen-diners and family rooms built to the highest standards.
£1,800
Per m² from
10–20
Weeks build time
+25%
Average added value
42 m²
Wandsworth project
Overview
Rear Extensions by AQ Group
A rear extension is the single most transformative change you can make to your home. By pushing your ground floor out into the garden, we create space that fundamentally changes how you live — open-plan kitchen-diners, light-filled family rooms, seamless indoor-outdoor living.
AQ Group manages every stage in-house: structural calculations, architectural drawings, planning applications, groundworks, structural frame, glazing, fit-out and decoration. A single point of contact from survey to sign-off means nothing falls through the gaps.
We work across London, Cambridge, Oxford and the Home Counties. Whether you want a modest 15m² kitchen extension or a sweeping 70m² double storey addition, our team has delivered it before — and we can show you the results.
What’s Included
Structural engineer calculations
Architectural drawings & planning
Groundworks & concrete foundations
Cavity wall or steel frame structure
Flat or pitched roof with waterproofing
Rear glazing — bifold, sliding or fixed
Internal floor, wall & ceiling finishes
Electrical first and second fix
Plumbing connections & underfloor heating option
Site clearance & snagging
Project Gallery
Our Rear Extensions work
Real projects delivered across London, Cambridge, Oxford and the Home Counties.
Our Process
How your rear extensions project works
A clear, managed process from first conversation to final sign-off. No surprises, no delays.
01
Free Survey
We visit your home, measure the space and discuss your vision. We advise on planning, structural requirements and realistic costs — all free of charge.
02
Design & Planning
Our architects produce full drawings. We submit planning applications or confirm permitted development rights and obtain building regulations approval.
03
Groundworks & Structure
Our directly employed team excavates, lays foundations, builds the structural frame and installs the roof — weathertight within weeks.
04
Fit-Out & Handover
Internal plastering, flooring, electrics, plumbing and decoration complete. A full snagging inspection before your walkthrough.
Investment & Timeline
What does a rear extensions cost?
All prices include labour, materials, project management, site clearance and building regulations. VAT and planning fees quoted separately.
Standard
£1,800 — £2,200
per m² · outer London
Brick or render external finish
UPVC or aluminium windows
Laminate or tile flooring
Painted plaster walls & ceilings
LED lighting throughout
Premium
£2,200 — £3,200
per m² · inner London
Brick, zinc or cladding finish
Bifold or sliding glass doors
Engineered timber or stone floors
Fitted kitchen allowance included
Underfloor heating option
Luxury
£3,200 — £5,000
per m² · central London
Natural stone or copper cladding
Crittall steel glazing system
Marble, slate or bespoke timber
Designer kitchen full fit-out
Smart home & full UFH
Build time: 10–20 weeks
Single storey: From 10 weeks
Double storey: From 16 weeks
Planning: 8 weeks typical
Common Questions
Your rear extensions questions answered
Everything you need to know before you start. Still have questions? Call us for free advice.
Do I need planning permission for a rear extension?
Many rear extensions fall under Permitted Development (PD) rights, which means no planning application is needed. Single storey extensions up to 4m on a detached house or 3m on semi-detached fall under PD. We confirm this at your free survey and handle all applications if planning is required.
How much disruption will there be while you build?
We maintain a clean, organised site at all times. Structural work (foundations and frame) creates the most noise and dust — typically 4–6 weeks. We use dust screens to protect your home and clear the site every day. Most families live in the property throughout.
Can I combine a rear extension with a side return?
Absolutely — and this is one of the most popular combinations for London terraced houses. A wrap-around rear and side return extension completely transforms the ground floor, often doubling the kitchen and living space.
What is a party wall agreement and do I need one?
If your extension is on or near a boundary shared with a neighbour, you’ll need a Party Wall Agreement. AQ Group handles this process for you. Most neighbours agree within a few weeks. It rarely causes delays.
How long does a rear extension add to my property value?
A well-designed rear extension typically adds 15–25% to the value of a UK home. In London and the South East, this can be significant — a £75,000 extension on a £600,000 home often returns £120,000–150,000 in added value.
You Might Also Consider
Related services
Combine with
Side Return Extension
Also popular
Loft Conversion
Often included
Kitchen Renovation
Get Started
Ready to plan your rear extensions?
Book a free site survey. We visit your home, assess what’s possible and deliver a fixed-price quote within 5 working days.
Back to Services
High Return on Investment
Loft Conversions unlocking your roof space
A loft conversion is the most cost-effective way to add a bedroom, home office or master suite without touching your garden. AQ Group delivers dormer, hip-to-gable, Velux and mansard conversions to the highest London standards.
£40k
Starting cost
8–14
Weeks build time
+22%
Average added value
Dormer
Hackney, London
Overview
Loft Conversions by AQ Group
The space above your ceiling is one of the most underused assets in any British home. A properly designed loft conversion can add a bedroom, en-suite bathroom, home office or private living room — all without a planning battle or the loss of your garden.
AQ Group offers every type of loft conversion: Velux (roof windows only, minimum disruption), dormer (the most popular — adds a vertical wall and full headroom), hip-to-gable (for semi-detached and detached homes), and full mansard (maximum space, requires planning). Our structural engineers design the floor strengthening and staircase as part of the build.
We serve homeowners across London, Cambridge, Oxford and Herefordshire. Each conversion includes full building regulations approval, a staircase designed for your home and a complete fit-out to your specification — from student lets to luxury master retreats.
What’s Included
Full structural survey & calculations
Architectural drawings & building regs
Roof structure alteration & dormer frame
Velux or dormer window installation
Floor joist strengthening
New staircase design & installation
Insulation to Part L standards
Plasterboard & plastering
Electrical first & second fix
En-suite bathroom option
Project Gallery
Our Loft Conversions work
Real projects delivered across London, Cambridge, Oxford and the Home Counties.
Our Process
How your loft conversions project works
A clear, managed process from first conversation to final sign-off. No surprises, no delays.
01
Feasibility Survey
We measure your loft, assess head height (minimum 2.2m required at the ridge) and confirm which conversion type suits your roof structure, budget and local planning rules.
02
Design & Approvals
Structural engineer designs the floor strengthening and staircase. Architect produces drawings. We submit for building regulations approval — planning only needed for mansard or hip-to-gable.
03
Structural Works
Roof alterations, dormer frame, floor strengthening and staircase installation are completed. The space is weathertight and ready for fit-out typically within 4–6 weeks.
04
Fit-Out & Handover
Plasterboarding, insulation, electrical and plumbing installation, flooring, decoration and any bathroom fit-out. Handed over with full building regulations completion certificate.
Investment & Timeline
What does a loft conversions cost?
All prices include labour, materials, project management, site clearance and building regulations. VAT and planning fees quoted separately.
Velux Conversion
£40,000 — £55,000
fixed price range
Roof windows only — no dormer
Minimum planning requirements
Floor strengthening & staircase
Full insulation & plasterboard
Electrics, flooring & decoration
Dormer Conversion
£55,000 — £85,000
most popular option
Full headroom throughout
Zinc, tile or flat roof dormer
En-suite bathroom included
Bespoke staircase
Full building regs completion
Mansard / Hip-Gable
£80,000 — £130,000
maximum space option
Near-vertical mansard walls
Maximum floor area
Planning application included
Multiple bedroom & bathroom layouts
Premium specification standard
Velux build: 6–9 weeks
Dormer build: 9–14 weeks
Mansard: 12–18 weeks
Regs approval: 5–8 weeks
Common Questions
Your loft conversions questions answered
Everything you need to know before you start. Still have questions? Call us for free advice.
How do I know if my loft is suitable for conversion?
The key measurement is the ridge height — you need at least 2.2m from the floor joists to the underside of the ridge beam. Most Victorian and Edwardian terraces in London have enough height. We measure this at your free survey.
What is the difference between a dormer and a mansard loft conversion?
A dormer adds a box-shaped vertical extension to the slope of the roof, increasing headroom and floor area significantly. A mansard replaces the entire rear roof slope with a near-vertical wall, maximising space but requiring planning permission. Dormers usually fall under Permitted Development.
Will a loft conversion require planning permission?
Velux and most dormer conversions fall under Permitted Development — no planning needed. Hip-to-gable and mansard conversions require a planning application. Properties in Conservation Areas may have additional restrictions. We confirm this at your free survey.
Can I have a bathroom in my loft conversion?
Yes — this is one of the most popular additions. AQ Group includes plumbing in the structural phase, so en-suites can be fitted as part of the project. We handle all drainage connections and water supply routing.
How much headroom will I have in the finished conversion?
A dormer conversion typically delivers 2.4m headroom throughout the usable floor area. Velux conversions are limited by the existing ridge height but can still provide comfortable room height in the centre. Our survey will show you exactly what is achievable.
You Might Also Consider
Related services
Also popular
Rear Extension
Often included
Bathroom Renovation
Combine with
Full Renovation
Get Started
Ready to plan your loft conversions?
Book a free site survey. We visit your home, assess what’s possible and deliver a fixed-price quote within 5 working days.
Back to Services
Maximum Space Creation
Basement Conversions beneath your home
When you cannot build up or out, go down. AQ Group specialises in full basement excavations and conversions — from home cinemas and gyms to additional bedrooms and wine cellars — with structural waterproofing that lasts a lifetime.
£2,500
Per m² from
20–36
Weeks build time
+30%
Value added typical
80 m²
Kensington project
Overview
Basement Conversions by AQ Group
Basement conversions are among the most complex and rewarding projects we undertake. They require deep structural expertise — underpinning, excavation, temporary works and structural waterproofing — and AQ Group has the in-house engineers and directly employed tradespeople to deliver them safely and on budget.
We offer two main approaches: conversion of an existing cellar or basement (faster and less expensive) and full dig-down excavation beneath a property with no existing basement (more complex, often requiring underpinning). Both require building regulations approval, structural engineer sign-off and specialist waterproofing.
Our waterproofing systems carry a 10-year warranty backed by a specialist insurer. Natural light is brought in via lightwells, glass floors or light tunnels. Ventilation and heating are designed from day one. The result is a space that feels as comfortable and bright as any room above ground.
What’s Included
Structural survey & engineer design
Underpinning where required
Excavation & soil removal
Reinforced concrete construction
Type A, B or C waterproofing system
Lightwell or glass floor for natural light
HVAC mechanical ventilation system
Electrical installation & lighting design
Plumbing & drainage
Full fit-out to specification
Project Gallery
Our Basement Conversions work
Real projects delivered across London, Cambridge, Oxford and the Home Counties.
Our Process
How your basement conversions project works
A clear, managed process from first conversation to final sign-off. No surprises, no delays.
01
Structural Survey
Our structural engineers survey your foundation type, soil conditions and existing drainage. A full geotechnical assessment identifies any groundwater, clay or made-ground issues before work begins.
02
Design & Consents
Architect and structural engineer produce working drawings. We obtain planning consent (usually required), building regulations approval and a party wall agreement with neighbours.
03
Excavation & Structure
Underpinning, excavation, reinforced concrete walls and floors. Waterproofing system installed. This phase typically takes 10–20 weeks depending on size and ground conditions.
04
Fit-Out & Light
Lightwell or glass floor installation, MEP (mechanical, electrical, plumbing), internal partitions, flooring, decoration and any bespoke fit-out. Handover with full completion certificate.
Investment & Timeline
What does a basement conversions cost?
All prices include labour, materials, project management, site clearance and building regulations. VAT and planning fees quoted separately.
Cellar Conversion
£2,500 — £3,500
per m² · existing space
Existing cellar or basement
Waterproofing & tanking
Headroom improvement option
Full fit-out included
Lightwell installation
Full Dig-Down
£3,500 — £5,500
per m² · most common
Full excavation beneath property
Structural underpinning
10-year waterproof warranty
MEP & HVAC design
Natural light integration
Large Scale / Premium
£5,500 — £8,000
per m² · complex projects
Cinema, gym or pool spec
Multi-level basement possible
Lightwell landscaping
Smart home integration
Designer fit-out included
Cellar conversion: 12–20 weeks
Dig-down: 20–36 weeks
Planning: 8–12 weeks
Waterproof warranty: 10 years
Common Questions
Your basement conversions questions answered
Everything you need to know before you start. Still have questions? Call us for free advice.
How do I know if basement conversion is possible for my property?
Most properties with a solid masonry foundation can have a basement conversion. Key factors are the existing foundation depth, soil type and neighbouring properties. We conduct a full structural survey as part of the free consultation to confirm feasibility before you commit.
What type of waterproofing do you use?
We use all three BS 8102 waterproofing systems depending on ground conditions: Type A (tanking), Type B (structural concrete) and Type C (cavity drain membrane). For most London projects, a combination of B and C provides the most reliable long-term result. All systems carry a 10-year insured warranty.
Will my neighbours be affected by the excavation?
All basement conversions adjacent to neighbours require a Party Wall Agreement. Our structural engineers design the underpinning sequence to minimise any movement. We monitor neighbouring properties throughout and carry £10M public liability insurance.
Can I add natural light to a basement?
Yes — and we strongly recommend it. Lightwells (excavated areas outside windows) bring in daylight and direct sunlight. Glass floor panels over the basement allow light to travel from ground floor. Sun tubes and light pipes are also options for properties where lightwells aren’t possible.
Do I need planning permission for a basement conversion?
In most cases yes, as basement conversions are considered permitted development only in limited circumstances. However, many local authorities look favourably on them. We handle the planning application and have a strong success record across all London boroughs and Home Counties.
You Might Also Consider
Related services
Also popular
Rear Extension
Combine with
Full Renovation
Also popular
Loft Conversion
Get Started
Ready to plan your basement conversions?
Book a free site survey. We visit your home, assess what’s possible and deliver a fixed-price quote within 5 working days.
Back to Services
Victorian & Edwardian Terraces
Side Return Extensions reclaiming lost space
The narrow passage running alongside a terraced house is one of London’s most underused spaces. A side return extension reclaims it, dramatically widening your kitchen and flooding the space with daylight through a glazed roof.
£2,000
Per m² from
10–16
Weeks build time
+20%
Value added typical
18 m²
Islington project
Overview
Side Return Extensions by AQ Group
For owners of Victorian and Edwardian terraced houses, the side return is often the most obvious and cost-effective way to transform the ground floor. By building into the narrow passage beside the original back addition, we can widen a kitchen from a cramped galley into a beautiful, light-filled space.
The glazed or roof-lantern ceiling over the infill area brings daylight deep into the kitchen and connecting dining area. Combined with a rear extension, the result is a completely open-plan ground floor that connects seamlessly to the garden. AQ Group handles party wall agreements, planning and all structural work in-house.
Side returns typically add 3.5–6 metres of width to the rear ground floor, transforming the cooking, dining and family living experience. We have completed side returns across London, Cambridge and Oxford — every Victorian and Edwardian terrace has one, and we know exactly how to make the most of it.
What’s Included
Party wall notice & agreement
Structural engineer calculations
Planning or PD confirmation
Excavation & strip foundations
Brick or block cavity wall
Flat or pitched glazed roof section
Roof lantern or rooflights
Internal opening into existing kitchen
Electrical & lighting design
Full floor, wall & ceiling finishes
Project Gallery
Our Side Return Extensions work
Real projects delivered across London, Cambridge, Oxford and the Home Counties.
Our Process
How your side return extensions project works
A clear, managed process from first conversation to final sign-off. No surprises, no delays.
01
Survey & Feasibility
We assess the width of your side passage, existing foundation depth and the party wall situation. We confirm permitted development rights and advise on the best roof design for your property.
02
Neighbour Agreements
We serve party wall notices on your behalf and manage the surveyor process with your neighbour. This typically takes 4–6 weeks and rarely causes issues in our experience.
03
Structural Build
Foundations, cavity wall construction and roof structure are completed. The roof lantern or glazing is installed and the space is watertight. Existing wall opening into the kitchen is formed with steel lintel.
04
Kitchen & Finishing
Flooring, plastering, electrics and plumbing are completed. New kitchen (if included) is installed and decorated. We leave a spotless, snagged and inspected space ready to enjoy.
Investment & Timeline
What does a side return extensions cost?
All prices include labour, materials, project management, site clearance and building regulations. VAT and planning fees quoted separately.
Side Return Only
£2,000 — £2,800
per m² · infill only
Cavity wall construction
Flat or pitched roof
Single rooflight or lantern
Floor screed or timber
Electrical first fix
With Glazed Roof
£2,800 — £3,800
per m² · most popular
Full glazed roof section
Roof lantern centrepiece
Bifold or sliding rear door
Underfloor heating option
Full fit-out included
Combined Rear +Side
£1,800 — £3,200
per m² · wrap-around
Best value per m²
Full open-plan ground floor
Maximises natural light
Single project discount
Premium spec available
Side return only: 8–12 weeks
With rear extension: 14–20 weeks
Party wall: 4–6 weeks
Planning (if needed): 8 weeks
Common Questions
Your side return extensions questions answered
Everything you need to know before you start. Still have questions? Call us for free advice.
What is a side return and does my house have one?
A side return is the narrow passage that runs alongside the rear addition of a Victorian or Edwardian terrace — typically 1.5–3 metres wide. Almost all London terraces of this era have one. It’s the “dead space” that often ends up as bins and bikes.
How much extra space does a side return extension add?
A typical side return infill adds 3.5–6m² of floor area. This might not sound like a lot, but the transformation to the kitchen width is dramatic — a 2.5m wide galley kitchen can become a 4.5m wide kitchen-diner, completely changing how the room feels and functions.
Do I need a party wall agreement for a side return extension?
In most cases yes, as the side return often runs along the boundary shared with your neighbour. We serve the notices, manage the process and in the vast majority of cases the neighbour consents. The Party Wall Act protects both parties and rarely causes delays to build programmes.
Can I add a glazed roof to a side return?
Yes — this is the most popular choice and delivers a transformative result. The glazed or lantern roof floods the kitchen with natural light and makes the infilled space feel like a premium extension rather than a narrow addition. We specify self-cleaning, solar-control glass for low maintenance.
Can I combine a side return with a rear extension at the same time?
Absolutely — and we recommend it. Doing both simultaneously as a “wrap-around” extension is more cost-effective than two separate projects and produces the best result. The entire ground floor rear becomes one cohesive, light-filled open-plan space.
You Might Also Consider
Related services
Combine with
Rear Extension
Also popular
Kitchen Renovation
Combine with
Full Renovation
Get Started
Ready to plan your side return extensions?
Book a free site survey. We visit your home, assess what’s possible and deliver a fixed-price quote within 5 working days.
Back to Services
Complete Transformation
Full Property Renovations from shell to spectacular
When a property needs everything, AQ Group delivers everything — structural alterations, complete rewiring, new plumbing, full kitchen and bathroom fit-outs and premium decoration. One team, one contract, zero headaches.
£800
Per m² from
12–40
Weeks build time
1
Point of contact
Complete
Chelsea project
Overview
Full Property Renovations by AQ Group
A full property renovation is one of the most satisfying projects we undertake. Whether it is a newly purchased property in need of modernisation, a dated period home requiring a sensitive update, or a complete reconfiguration of a tired family house, AQ Group has the team and the experience to deliver.
We are a full design-and-build contractor. This means our directly employed team handles every trade: structural alterations, steel installation, rewiring, replumbing, plastering, kitchen and bathroom fit-out, flooring, tiling, decoration and external works. You have one contract, one programme and one project manager who knows every detail of your job.
Full renovations we have delivered range from modest 3-bedroom terrace refreshes (£60,000–80,000) to complete gut-and-rebuild transformations of detached houses in Cambridge and Oxford (£300,000–500,000+). We provide accurate, fixed-price quotes and we stand behind them.
What’s Included
Full structural survey & design
Planning & building regulations
Structural alterations & steelwork
Complete rewiring (Part P certified)
Full plumbing & heating replacement
New kitchen supply & installation
All bathrooms supply & fit-out
All flooring types & tiling
Full decoration throughout
External works & landscaping option
Project Gallery
Our Full Property Renovations work
Real projects delivered across London, Cambridge, Oxford and the Home Counties.
Our Process
How your full property renovations project works
A clear, managed process from first conversation to final sign-off. No surprises, no delays.
01
Discovery & Brief
We meet, survey the property and discuss your vision, priorities and budget. We review structural drawings if available and identify any hidden issues before pricing. A detailed scope of works is agreed before any contract is signed.
02
Design & Specification
Our architect and interior design partners (if needed) produce drawings and a full materials specification. We price to this specification line by line — you know exactly what every pound is spent on.
03
Structural & Services Phase
Strip-out, structural alterations, steelwork, new drainage, plumbing first fix and electrical first fix. The “blank canvas” phase — often the most dramatic transformation in the programme.
04
Fit-Out & Completion
Plastering, flooring, kitchen and bathroom installations, second-fix electrics and plumbing, tiling, decoration and snagging. A full photographic record and handover pack are provided at completion.
Investment & Timeline
What does a full property renovations cost?
All prices include labour, materials, project management, site clearance and building regulations. VAT and planning fees quoted separately.
Light Refresh
£800 — £1,200
per m² · cosmetic
New kitchen & bathrooms
Full redecoration
Flooring replacement
Lighting update
No structural works
Full Renovation
£1,200 — £2,000
per m² · most common
Structural alterations
Complete rewire & replumb
New kitchen & all bathrooms
All flooring & finishes
Extension option
Premium Transformation
£2,000 — £3,500
per m² · luxury spec
Full reconfiguration
Designer kitchen & bathrooms
Smart home & AV
Bespoke joinery throughout
External works & landscaping
Light refresh: 6–12 weeks
Full renovation: 16–30 weeks
Large/complex: 30–40 weeks
Phased available: Yes
Common Questions
Your full property renovations questions answered
Everything you need to know before you start. Still have questions? Call us for free advice.
Do I need to move out during a full renovation?
For a light cosmetic refresh, many clients choose to stay in one part of the house while we work on another. For a full renovation with structural works and complete rewiring/replumbing, we generally recommend moving out for the duration — typically 16–30 weeks. We can help you plan the decant.
How do you price a full renovation?
We provide a fully itemised, fixed-price quotation based on a detailed scope of works and materials specification. Unlike many contractors who provide vague “ballpark” figures, our quotes break down every trade, every room and every material. We stand behind the price we give.
Can you handle the design as well as the build?
Yes. AQ Group works with a network of architects and interior designers for clients who need design input. We can manage the full design-and-build process under a single contract, or work with your own architect’s drawings. Either way, we manage the entire build from one contract.
What happens if you find unexpected problems during the build?
Hidden problems — rot, asbestos, failed drainage — are a reality in older properties. We conduct a thorough survey before pricing to minimise surprises. When unexpected issues do arise, we notify you immediately, explain the options and agree any cost variation in writing before proceeding. We never present surprises at the end.
Can you phase the renovation to manage costs?
Absolutely. Many of our clients phase full renovations over 1–3 years: ground floor first, then loft, then bathrooms. We design the project with phasing in mind from the start so each phase connects cleanly to the next without duplication of costs.
You Might Also Consider
Related services
Key part of
Kitchen Renovation
Key part of
Bathroom Renovation
Combine with
Rear Extension
Get Started
Ready to plan your full property renovations?
Book a free site survey. We visit your home, assess what’s possible and deliver a fixed-price quote within 5 working days.
Back to Services
Garden Connection
Conservatories & Orangeries bringing the outside in
A beautifully designed conservatory or orangery dissolves the boundary between your home and garden. AQ Group delivers glass extensions from sleek aluminium conservatories to traditional brick orangeries with dramatic roof lanterns.
£1,400
Per m² from
6–12
Weeks build time
+15%
Value added typical
Orangery
Richmond project
Overview
Conservatories & Orangeries by AQ Group
A conservatory or orangery is the most elegant way to extend your living space into the garden. Unlike a standard extension, the emphasis is on glazing — creating a light-filled room that blurs the line between indoors and outside, usable year-round with the right thermal performance.
AQ Group offers full-width aluminium conservatories with slimline profiles and maximum glass area, traditional brick pier orangeries with flat or lantern roofs, and contemporary glass box extensions that combine solid and glazed elements for a modern architectural statement. All our glazing is thermally broken, argon-filled and fitted with solar control glass.
Underfloor heating is our standard recommendation for all conservatories and orangeries — it keeps the space comfortable in winter without radiators interrupting the glass walls. We also specify self-cleaning glass for roof panels as standard, reducing maintenance to near-zero.
What’s Included
Architectural drawings & planning
Strip foundations & DPC
Brick or block dwarf walls (orangery)
Aluminium or steel frame system
Thermally broken double or triple glazing
Solar control & self-cleaning roof glass
Roof lantern or ridge glazing option
Underfloor heating system
Electrical installation & LED lighting
Internal floor finishes & decoration
Project Gallery
Our Conservatories & Orangeries work
Real projects delivered across London, Cambridge, Oxford and the Home Counties.
Our Process
How your conservatories & orangeries project works
A clear, managed process from first conversation to final sign-off. No surprises, no delays.
01
Design & Survey
We survey the proposed location, discuss your preferred style — conservatory or orangery, aluminium or steel, flat or lantern roof — and prepare architectural drawings for planning confirmation.
02
Planning & Supply
Most conservatories fall under Permitted Development. We confirm PD rights or submit planning. Frame sections are factory-manufactured while foundations are prepared.
03
Foundation & Frame
Strip foundations, dwarf walls (orangery) and frame installation. The structure is typically weathertight within 2–3 weeks of starting on site.
04
Glazing & Fit-Out
Roof and wall glazing installed, followed by underfloor heating, electrical works, internal finishes and decoration. Final handover with full thermal performance certification.
Investment & Timeline
What does a conservatories & orangeries cost?
All prices include labour, materials, project management, site clearance and building regulations. VAT and planning fees quoted separately.
Lean-To Conservatory
£1,400 — £2,200
per m² · aluminium
Slimline aluminium frame
Polycarbonate or glass roof
Double glazed walls
Basic flooring included
Single door access
Edwardian / Victorian
£2,200 — £3,200
per m² · most popular
Full glass roof section
Thermally broken aluminium
Bifold or French doors
Underfloor heating included
Solid flooring
Orangery / Glass Box
£3,200 — £5,500
per m² · premium
Brick pier or solid walls
Roof lantern centrepiece
Crittall or steel glazing
Designer flooring & finishes
Smart home & AV option
Lean-to: 5–8 weeks
Full conservatory: 8–12 weeks
Orangery: 10–16 weeks
Planning (if needed): 8 weeks
Common Questions
Your conservatories & orangeries questions answered
Everything you need to know before you start. Still have questions? Call us for free advice.
What is the difference between a conservatory and an orangery?
A conservatory is primarily glass — glass roof, glass walls, aluminium or uPVC frame. An orangery has solid masonry walls (brick or render) with a glazed roof lantern — it feels more like a room and less like a greenhouse. Orangeries are more expensive but more thermally efficient and architecturally impressive.
Can a conservatory be used year-round?
With modern thermally broken glazing, underfloor heating and solar control glass, yes — absolutely. Old polycarbonate conservatories were unbearably hot in summer and cold in winter. Our aluminium-framed, triple-glazed conservatories with solar control glass maintain comfortable temperatures year-round.
Do I need planning permission for a conservatory?
Most conservatories fall under Permitted Development — no planning needed — if they are under 50% of the original house footprint, single storey and not higher than the ridge. We confirm this at your free survey. Properties in Conservation Areas may have restrictions.
What glazing options do you recommend?
We specify thermally broken double or triple glazing for walls and self-cleaning, solar control glass for roof sections as standard. Self-cleaning roof glass uses a photocatalytic coating to break down dirt and rain to wash it off — vital for roofs that are difficult to reach. Solar control glass prevents overheating in summer.
Can you add a conservatory to a listed building?
Listed buildings require Listed Building Consent for any extension, including conservatories. We have experience navigating Listed Building applications and work with conservation officers to design extensions that receive approval. The key is using appropriate materials and respecting the character of the original building.
You Might Also Consider
Related services
Also popular
Rear Extension
Combine with
Side Return Extension
Combine with
Full Renovation
Get Started
Ready to plan your conservatories & orangeries?
Book a free site survey. We visit your home, assess what’s possible and deliver a fixed-price quote within 5 working days.
Back to Services
Heart of the Home
Kitchen Renovations designed around how you live
A kitchen renovation by AQ Group is more than new cabinets and worktops. We manage the complete transformation — structural changes, new drainage, full electrical, plumbing and a fitted kitchen to your exact specification.
£15,000
Starting cost
3–10
Weeks build time
+12%
Property value added
Premium
Wandsworth project
Overview
Kitchen Renovations by AQ Group
The kitchen is the most-used and most-valued room in any home. A beautifully executed kitchen renovation transforms not just the room itself, but the way your household functions every day. AQ Group takes a whole-room approach — we plan the layout, specify the units, manage structural changes and fit everything ourselves.
We work with leading kitchen suppliers — from Howdens and Wren for quality mid-range kitchens to bespoke joinery houses for fully custom cabinetry. Our in-house team handles all trades: structural alterations to walls, complete electrical rewire of the kitchen, new plumbing and drainage, floor levelling, tiling and decoration. No coordinating separate trades.
Kitchen renovations are also an ideal opportunity to combine with an extension. Many of our clients use a kitchen renovation as the fit-out phase following a rear or side return extension — a coordinated project that maximises value and minimises disruption.
What’s Included
Full kitchen design & layout planning
Structural wall removal option
New electrical circuits & sockets
Plumbing & drainage relocation
Full kitchen unit supply & installation
Worktop supply & templating
Appliance installation & connection
Splashback tiling & decoration
Flooring supply & installation
Lighting design & installation
Project Gallery
Our Kitchen Renovations work
Real projects delivered across London, Cambridge, Oxford and the Home Counties.
Our Process
How your kitchen renovations project works
A clear, managed process from first conversation to final sign-off. No surprises, no delays.
01
Design Consultation
We meet at your home, discuss the current kitchen’s shortcomings and your wishlist. We take measurements, review the existing services layout and propose a new design. You receive a design drawing with your quote.
02
Structural Works
Any wall removals, new steelwork or structural changes are completed first. New drainage routes, electrical circuits and plumbing positions are established before plastering.
03
Supply & Preparation
Flooring preparation, wall tiling backgrounds and appliance recesses are prepared. Your kitchen units are delivered and stored safely on site.
04
Install & Commission
Units, worktops, appliances, splashbacks, lighting and flooring installed. All appliances tested and commissioned. Full snagging inspection before handover.
Investment & Timeline
What does a kitchen renovations cost?
All prices include labour, materials, project management, site clearance and building regulations. VAT and planning fees quoted separately.
Standard Kitchen
£15,000 — £25,000
complete supply & fit
Howdens or equivalent units
Laminate or solid wood worktops
Integrated appliances
Full tiling & flooring
Electrics & plumbing included
Premium Kitchen
£25,000 — £50,000
most popular
Quartz or granite worktops
Handleless or shaker units
Premium appliance package
Feature lighting & LEDs
Island option included
Luxury / Bespoke
£50,000 — £120,000
fully custom
Bespoke hand-painted cabinetry
Natural stone worktops
Miele, Gaggenau or similar
Full structural changes
Designer finishes throughout
Standard kitchen: 3–5 weeks
Premium kitchen: 5–8 weeks
Bespoke / structural: 8–14 weeks
Delivery lead time: 3–10 weeks
Common Questions
Your kitchen renovations questions answered
Everything you need to know before you start. Still have questions? Call us for free advice.
Can you remove a wall to open up the kitchen?
Yes — wall removal and kitchen renovation go hand in hand. Our structural engineers assess whether the wall is load-bearing and design the appropriate steel or concrete beam. We handle all the structural work, building regulations and plastering as part of the kitchen project.
Do you supply the kitchen or just fit it?
Both. We can supply and fit a kitchen from your chosen supplier (IKEA, Howdens, Wren, bespoke joinery) or we can recommend and manage the entire supply. We have preferred supplier relationships that give our clients better pricing and lead times than buying directly.
How long will my kitchen be out of use during the renovation?
Typically 2–4 weeks for the main installation phase — the period when you have no functioning kitchen. Many clients set up a temporary kitchen in another room. Structural prep work before this phase can be completed with the kitchen in use.
Can I keep my existing layout and just replace the units?
Absolutely — this is called a “like for like” replacement and is the most cost-effective kitchen renovation. Same layout, same appliance positions — but new units, new worktops, new flooring and new decoration. It transforms the look without structural changes.
Can you combine a kitchen renovation with a rear extension?
This is one of our most popular combinations. A rear extension creates the space and the kitchen renovation fills it. We project manage both simultaneously under a single contract — the structural extension work happens first, followed by the kitchen fit-out. The result is a seamless, purpose-built kitchen-diner.
You Might Also Consider
Related services
Combine with
Rear Extension
Combine with
Side Return
Also popular
Bathroom Renovation
Get Started
Ready to plan your kitchen renovations?
Book a free site survey. We visit your home, assess what’s possible and deliver a fixed-price quote within 5 working days.
Back to Services
Luxury & Functionality
Bathroom Renovations your private sanctuary
A bathroom renovation by AQ Group turns a functional necessity into a daily luxury. From complete en-suite installations in loft conversions to full master bathroom transformations with natural stone and heated floors — we manage every detail.
£8,000
Starting cost
2–5
Weeks build time
+8%
Property value added
En-Suite
Hackney project
Overview
Bathroom Renovations by AQ Group
Bathroom renovation is one of the most impactful changes you can make to a home — particularly for sale or rental. AQ Group manages the complete transformation: full strip-out, waterproofing, new plumbing and waste, tiling, sanitaryware supply and installation and electrical work including underfloor heating and lighting.
We handle all types of bathroom project: refurbishing an existing bathroom in the same layout (fastest and most cost-effective), reconfiguring the layout for better use of space, converting a bedroom into a new bathroom or en-suite, and adding a luxury master bathroom suite as part of a loft conversion or full renovation.
Our bathroom projects include all necessary waterproofing (tanking to BS 5385), plumbing first and second fix, floor levelling, full wall and floor tiling, underfloor heating and all sanitaryware supply and installation. We recommend specific products based on our experience of what lasts — and what looks great for years, not just months.
What’s Included
Full strip-out & waste disposal
Plumbing first fix & reconfiguration
Waterproofing & tanking (BS 5385)
Floor levelling & tile adhesive bed
Full wall & floor tiling
Underfloor heating & thermostat
Sanitaryware supply & installation
Shower enclosure & tray or wet room
Vanity, mirror & accessories
Electrical SELV lighting & extractor fan
Project Gallery
Our Bathroom Renovations work
Real projects delivered across London, Cambridge, Oxford and the Home Counties.
Our Process
How your bathroom renovations project works
A clear, managed process from first conversation to final sign-off. No surprises, no delays.
01
Design & Selection
We survey your existing bathroom, discuss the new layout and specification, and help you select sanitaryware, tiles and finishes. We provide a full materials schedule so you know exactly what you are getting before any work starts.
02
Strip-Out & Plumbing
Full strip-out of all existing fittings. New plumbing first fix — waste and supply pipes routed to new positions. Waterproofing system applied to walls and floor in wet areas. Floor levelling compound if needed.
03
Tiling & Heating
Wall and floor tiles laid to a setting-out plan agreed with you. Underfloor heating installed under the floor tiles. The bathroom is tiled and grouted before any sanitaryware is fitted.
04
Fit-Out & Handover
All sanitaryware, shower, bath, vanity and accessories installed. Electricals connected (SELV lighting, extractor, underfloor heating thermostat). Full snagging inspection and 12-month workmanship guarantee.
Investment & Timeline
What does a bathroom renovations cost?
All prices include labour, materials, project management, site clearance and building regulations. VAT and planning fees quoted separately.
Standard Bathroom
£8,000 — £14,000
complete supply & fit
Like-for-like layout
Ceramic or porcelain tiles
Standard sanitaryware suite
Shower enclosure or bath
Heated towel rail
Premium Bathroom
£14,000 — £28,000
most popular
New layout if required
Large format tiles
Quality branded sanitaryware
Walk-in shower or freestanding bath
Underfloor heating included
Luxury Master Suite
£28,000 — £65,000
full transformation
Natural stone tiles & features
Designer sanitaryware
Wet room or spa shower
Bespoke vanity & storage
Smart controls & lighting
Standard refurb: 2–3 weeks
Premium bathroom: 3–5 weeks
Large / en-suite new: 4–8 weeks
Workmanship guarantee: 12 months
Common Questions
Your bathroom renovations questions answered
Everything you need to know before you start. Still have questions? Call us for free advice.
Can you move the toilet, bath or shower to a different position?
Yes — this is one of the most common requests. Moving waste positions requires re-routing the drainage. Our plumbers are experienced in all types of drainage reconfiguration, from rerouting under concrete floors to creating new waste routes through floor joists.
What is a wet room and can you install one?
A wet room is a fully waterproofed, level-access shower area with a floor drain rather than a shower tray. They look beautiful and are highly practical. AQ Group waterproofs the entire floor and lower walls using a tanking membrane system, then tiles over it. We strongly recommend electric underfloor heating in wet rooms.
Do you supply the tiles and sanitaryware or do I need to buy them?
Either works. We can supply everything as part of a complete package (using our trade accounts for better pricing), or you can select your own tiles and sanitaryware and we will fit them. Many clients prefer to choose their own tiles from specialist suppliers — we advise on quantities, sizes and suitability.
How do you prevent water damage in bathrooms you tile?
We apply a full tanking membrane (waterproof coating) to all walls in wet areas and the floor before tiling. This system complies with BS 5385 and ensures that even if grout cracks over time, no water can reach the structure beneath. It is the most important step and we never skip it.
Can you add an en-suite to a bedroom?
Yes — adding an en-suite to a master bedroom is one of our most popular standalone projects. We assess the structural floor, identify the most practical drainage route and design the en-suite to maximise the available space. En-suites can be as compact as 2.5m² or as spacious as you wish.
You Might Also Consider
Related services
Often included in
Loft Conversion
Also popular
Kitchen Renovation
Part of
Full Renovation
Get Started
Ready to plan your bathroom renovations?
Book a free site survey. We visit your home, assess what’s possible and deliver a fixed-price quote within 5 working days.
Expert Knowledge
Insights & Guides
Honest advice on extensions, renovations, planning and costs — written by people who build them every day across London, Cambridge, Oxford and Herefordshire.
Latest Articles
Everything you need to know before you start your project
Pricing Guide
Rear Extension Cost London 2026: Complete Price Guide
Everything you need to know about rear extension costs in London in 2026 — from groundworks to glazing, standard to luxury specification.
June 2026 · 7 minRead article →
Pricing Guide
Loft Conversion Cost 2026: Dormer vs Velux vs Mansard Compared
Dormer, Velux, hip-to-gable or mansard — a complete cost comparison for every loft conversion type in 2026.
May 2026 · 8 minRead article →
Planning & Regulations
Planning Permission for a Rear Extension: Do You Actually Need It?
The plain-English guide to Permitted Development rules for rear extensions in 2026 — and when you need to apply for planning permission.
May 2026 · 6 minRead article →
Extension Types
Side Return Extension: The Complete London Guide 2026
How side return extensions work, what they cost, party wall agreements explained, and whether your Victorian terrace is suitable.
April 2026 · 7 minRead article →
Design & Inspiration
Kitchen Extension Ideas: Creating the Perfect Open-Plan Home
Design ideas, structural options, glazing choices and budgets for creating a stunning open-plan kitchen extension in 2026.
April 2026 · 6 minRead article →
Project Planning
How Long Does a House Extension Take?: Realistic 2026 Timeline
Realistic timelines for every type of extension — from planning to completion — so you can plan your life around the build.
March 2026 · 5 minRead article →
Pricing Guide
Basement Conversion Cost 2026: Is It Worth It?
Full cost breakdown for basement conversions in 2026 — cellar conversions vs full dig-downs, and whether the ROI stacks up in your area.
March 2026 · 8 minRead article →
Advice & Guides
10 Questions to Ask Your Builder: Before Signing Anything
The questions every homeowner should ask before signing a building contract — plus the red flags that should make you walk away immediately.
February 2026 · 5 minRead article →
Ready to start your project?
Get a free, no-obligation quote from London’s most trusted extension specialists.
Back to Insights
Pricing GuideJune 2026⏱ 7 min
Rear Extension Cost London 2026 Complete Price Guide
A rear extension is the single most popular home improvement in London. But how much should you budget in 2026? We break down every cost — from groundworks to glazing — so you know exactly what to expect before you speak to a single contractor.
What does a rear extension cost in London in 2026?
The honest answer: a single-storey rear extension in London costs between £1,800 and £5,000 per m² depending on your location within London, the specification you choose, and the complexity of the build. For a typical 25–35m² extension, most homeowners budget £55,000–£120,000 all in.
Quick Cost Reference — 2026
Single storey, standard spec, outer London: £1,800–£2,200/m²
Single storey, premium spec, inner London: £2,500–£3,500/m²
Double storey, premium spec, central London: £3,000–£5,000/m²
Five factors account for most of the variation in extension costs across London:
1. Location within London
Labour costs in central London (Zones 1–2) run 25–35% higher than outer London (Zones 4–6). The same 30m² premium extension that costs £80,000 in Bromley might cost £108,000 in Chelsea. This isn’t just contractor markup — it reflects parking costs, congestion charges, restricted access and longer working days.
2. Specification level
Standard: Brick or render finish, UPVC windows, laminate flooring, painted walls. Functional and solid, but no design flourishes. Premium: Bifold or sliding doors, zinc or cladding finish, engineered timber floors, fitted kitchen, underfloor heating. This is where most London homeowners land. Luxury: Crittall glazing, natural stone, bespoke joinery, smart home integration, designer kitchen. Prices here are genuinely open-ended.
3. Structural complexity
A straightforward rear extension on a flat site with no party wall issues is the simplest and cheapest scenario. Add a sloping garden, clay soil requiring deeper foundations, a shared flank wall, or restricted access for materials, and costs climb quickly. A full structural survey before pricing is the only way to know what you are dealing with.
4. Groundworks
The ground beneath your garden determines how much the extension foundation costs. London clay is notorious for shrinkage and heave — many London properties require deeper strip foundations or even engineered solutions, adding £3,000–£15,000 to the groundworks bill. This is why no reputable contractor can give you a firm price without a site visit.
5. Glazing
The rear wall of most modern extensions is primarily glass — bifold doors, fixed glazing panels, or a combination. Bifold doors range from £3,500 for a basic aluminium set to £18,000 for Crittall steel-framed units. A roof lantern adds £2,500–£8,000. Budget glazing significantly, because it defines the look and feel of the finished space.
“The extension quote that looks cheapest on paper is almost never the cheapest project. The variance is always in what they left out.”
What is included in a professional quote?
A thorough, fixed-price quote from a reputable contractor should include: structural engineer calculations, architect drawings, groundworks and foundations, structural frame and roof, waterproofing, windows and rear glazing, internal plastering, electrical first and second fix, and site clearance. What it typically does not include: planning application fees (£206 as of 2026), building regulations application (£500–£900), kitchen or bathroom fit-out (quoted separately), and any decorating beyond the extension itself.
Single storey vs double storey — which adds more value?
A single-storey rear extension typically adds 15–22% to a property’s value. A double-storey extension adds more space (and therefore more value), but the cost per m² is lower than single-storey because the foundations, roof and scaffolding costs are shared across two floors. In high-value London postcodes, the return on a well-executed double-storey extension almost always exceeds the build cost.
Extension Type
Typical Size
Budget Range
Timeline
Single storey (standard)
20–35m²
£40,000–£77,000
10–14 wks
Single storey (premium)
20–35m²
£55,000–£112,000
12–16 wks
Double storey (premium)
40–70m²
£100,000–£224,000
16–24 wks
How to get an accurate price
The only way to get an accurate price is a detailed site survey followed by a written, itemised fixed-price quote. Be wary of any contractor who quotes from photos or plans alone — they are either guessing or leaving themselves room to charge more later. AQ Group provides free site surveys across London, Cambridge, Oxford and Herefordshire, with a fixed-price quote delivered within 5 working days.
Ready to get started?
Book a free site survey
No obligation. Fixed-price quote within 5 working days. AQ Group serves London, Cambridge, Oxford and Herefordshire.
Related Articles
Continue reading
Pricing Guide
Loft Conversion Cost 2026
Planning & Regulations
Planning Permission for a Rear Extension
Design & Inspiration
Kitchen Extension Ideas
Back to Insights
Pricing GuideMay 2026⏱ 8 min
Loft Conversion Cost 2026 Dormer vs Velux vs Mansard Compared
A loft conversion adds a bedroom and 20–25% to your property value without touching your garden. But which type is right for your home — and what will it actually cost in 2026?
How much does a loft conversion cost in 2026?
Loft conversion costs in the UK range from £35,000 to £130,000+ depending on the conversion type, your property and your specification. The single biggest factor is which type of conversion your roof structure allows — and that determines everything else.
2026 Cost Summary by Type
Velux (roof windows only): £35,000–£55,000
Dormer (most popular): £50,000–£85,000
Hip-to-gable: £60,000–£95,000
Mansard (maximum space): £80,000–£130,000+
Velux loft conversion — the entry-level option
A Velux conversion involves no structural alterations to the roof — only the addition of roof windows (Velux being the most recognised brand), floor strengthening and a new staircase. It is the fastest, least expensive option, but it is also the most limited. You get natural light and headroom only in the centre of the space where the ridge is highest. For many properties, the usable floor area at the minimum 2.2m standing height is surprisingly small.
Best for: Properties with high ridge heights, tight budgets, or where a home office or simple guest room is the goal rather than a full master bedroom.
Dormer loft conversion — the most popular choice
A dormer adds a box-shaped vertical extension to the rear slope of the roof, creating full headroom throughout the converted space. It is by far the most popular loft conversion type in London — it dramatically increases usable floor area, allows a proper en-suite bathroom, and typically falls under Permitted Development (no planning permission required).
“A well-executed dormer is the highest-returning home improvement per pound spent in London. It adds a bedroom, a bathroom and significant kerb appeal.”
Hip-to-gable conversion — for semi-detached and detached homes
Many semi-detached and detached homes have a “hipped” roof — where the end of the roof slopes inward rather than ending in a flat gable wall. A hip-to-gable conversion removes this slope and replaces it with a vertical gable end, creating significantly more internal space. It is usually combined with a dormer at the rear. Hip-to-gable conversions on semi-detached properties require planning permission, as they change the roofline visibly from the street.
Mansard conversion — maximum space, requires planning
A mansard conversion replaces the entire rear roof slope with a near-vertical wall (typically at 72 degrees) and a flat or shallow-pitched roof. It creates the maximum possible floor area from a loft conversion — often close to the footprint of the floor below. Mansard conversions always require full planning permission and are common in London conservation areas where they are sometimes the only type approved. They are also the most expensive.
Type
Headroom
Planning Needed
Cost Range
Velux
Centre only
Usually not
£35k–£55k
Dormer
Throughout
Usually not
£50k–£85k
Hip-to-gable
Throughout
Yes
£60k–£95k
Mansard
Maximum
Always
£80k–£130k+
Is a loft conversion worth it?
In London, yes — almost always. A well-designed dormer conversion adds 20–25% to a property’s value. On a £600,000 London terrace, that is £120,000–£150,000 of added value against a build cost of £55,000–£85,000. Even in slower markets and outside London, loft conversions consistently return more than their build cost.
Ready to get started?
Book a free site survey
No obligation. Fixed-price quote within 5 working days. AQ Group serves London, Cambridge, Oxford and Herefordshire.
Related Articles
Continue reading
Pricing Guide
Rear Extension Cost London 2026
Planning & Regulations
Planning Permission for a Rear Extension
Project Planning
How Long Does a House Extension Take?
Back to Insights
Planning & RegulationsMay 2026⏱ 6 min
Planning Permission for a Rear Extension Do You Actually Need It?
Thousands of London homeowners apply for planning permission when they don’t need to. Thousands more assume they are covered by Permitted Development when they are not. Here is exactly how to tell the difference.
Permitted Development — your right to build without applying
Most homeowners in England have the right to extend their home under Permitted Development (PD) rights — meaning they can build without submitting a planning application. These rights were significantly expanded by the UK government in 2020 and remain in place in 2026. Understanding them properly could save you £2,000–£5,000 in architect and planning fees, and eight weeks of waiting.
Permitted Development Rules for Rear Extensions (2026)
Detached houses: Single storey up to 8m from the original rear wall
Semi-detached and terraced: Single storey up to 6m from the original rear wall
Maximum height: 4m for single storey (3m within 2m of boundary)
Double storey: Up to 3m from original rear wall, must be 7m from rear boundary
Materials must be similar in appearance to the existing house
When do you need planning permission?
You need full planning permission for a rear extension if: your property is in a Conservation Area or is Listed; you have used up your PD rights through previous extensions; you want to exceed the PD size limits; your extension would cover more than 50% of the original garden; or your local authority has removed PD rights through an Article 4 Direction.
Conservation Areas
Large parts of inner London — and many town centres across Cambridge, Oxford and the Home Counties — are designated Conservation Areas. In these areas, Permitted Development rights are more restricted, and any extension visible from a public highway usually requires planning permission. Your local authority’s website will show whether your property is within a Conservation Area.
Article 4 Directions
Some London boroughs — including parts of Islington, Hackney and Southwark — have removed Permitted Development rights in specific streets or areas via Article 4 Directions. This is worth checking at the planning pre-application stage.
“A Lawful Development Certificate is optional but strongly recommended. It proves your extension was built within Permitted Development rights — protecting you when you come to sell.”
The Neighbour Consultation Scheme — what is it?
For single-storey rear extensions between 4m and 8m (detached) or 3m and 6m (semi/terraced), the government introduced the Neighbour Consultation Scheme. You must notify your local authority, who consult your neighbours for 42 days. If no objections are received, the extension can proceed. This is not a planning application — it cannot be refused — but it does require a formal notification. AQ Group handles this process for all clients as part of our pre-build service.
What is a Lawful Development Certificate?
A Lawful Development Certificate (LDC) is a formal confirmation from your local authority that your proposed or completed extension is lawful under Permitted Development rights. It costs around £100–£200 and takes 8 weeks to obtain. It is not legally required — but it is strongly recommended, particularly if you plan to sell in the next decade. Buyers’ solicitors increasingly ask for it, and without it, a sale can be delayed or fall through entirely.
How long does planning permission take?
A standard householder planning application takes 8 weeks from submission to decision. More complex applications, or those requiring additional consultations, can take 12–16 weeks. AQ Group submits and manages planning applications on behalf of all clients where required, typically securing approval on first submission.
Ready to get started?
Book a free site survey
No obligation. Fixed-price quote within 5 working days. AQ Group serves London, Cambridge, Oxford and Herefordshire.
Related Articles
Continue reading
Pricing Guide
Rear Extension Cost London 2026
Extension Types
Side Return Extension
Project Planning
How Long Does a House Extension Take?
Back to Insights
Extension TypesApril 2026⏱ 7 min
Side Return Extension The Complete London Guide 2026
That narrow alley beside your Victorian terrace is hiding one of the most cost-effective home transformations available to a London homeowner. Here is everything you need to know before you start.
What is a side return extension?
A side return extension fills in the narrow passage that runs alongside the rear addition (“back addition”) of a Victorian or Edwardian terraced house. This alleyway — typically 1.5–3 metres wide — is the product of how these houses were originally designed: the main house sits forward on the plot, and a narrower rear addition houses the original kitchen and scullery. The passage beside it was left for access.
By building into this passage, you can dramatically widen the rear ground floor — transforming a dark, narrow galley kitchen into a bright, wide kitchen-diner flooded with daylight from a glazed or lantern roof above.
Side Return at a Glance
Typical width gained: 1.5–3 metres
Typical floor area added: 8–18m²
Cost range: £25,000–£65,000
Planning permission: Usually not required (PD)
Party wall agreement: Almost always required
Build time: 8–14 weeks
Does my house have a side return?
If your home is a Victorian or Edwardian terraced or semi-detached house built before 1914, it almost certainly has a side return. The passage runs alongside the “back addition” — the narrower rear section of the house that typically houses the original kitchen. You can identify it by looking at the plan of your house from above: the “L-shaped” footprint is the giveaway.
The party wall agreement — explained simply
Because the side return runs along the boundary with your neighbour, your build will almost certainly trigger the Party Wall Act 1996. You are legally required to serve notice on any adjoining neighbours whose property shares a wall, boundary, or is within 3–6 metres of your excavation. This does not mean your neighbour can stop your extension — they cannot. But they have the right to appoint a surveyor, and if they dissent, a Party Wall Award is produced that governs how the work is carried out.
“In 15 years of building side returns across London, we have never had a neighbour successfully block a project. The Party Wall Act protects both sides — and most neighbours are reasonable.”
Glazed roof vs solid roof — which is better?
The roof of a side return infill is one of the most important design decisions you will make. A glazed or part-glazed roof — typically using structural glass or a roof lantern — transforms the space by flooding it with natural daylight. The alternative, a solid pitched or flat roof with rooflights, is less expensive but brings in less light.
We almost always recommend a glazed roof for side returns. The additional cost (£3,000–£12,000 over a solid roof) is consistently justified by the quality of the resulting space. Self-cleaning, solar-control glass keeps maintenance minimal and the space comfortable year-round.
Can I combine a side return with a rear extension?
Yes — and this is the most popular combination for London terraced houses. A “wrap-around” extension combines the side return infill with a rear extension, creating a completely open-plan ground floor that wraps around the original back addition. Doing both simultaneously is significantly more cost-effective than two separate projects, and the result — a large, light-filled kitchen-diner-living room connecting to the garden — is among the most sought-after home features in London.
Ready to get started?
Book a free site survey
No obligation. Fixed-price quote within 5 working days. AQ Group serves London, Cambridge, Oxford and Herefordshire.
Related Articles
Continue reading
Pricing Guide
Rear Extension Cost London 2026
Planning & Regulations
Planning Permission for a Rear Extension
Design & Inspiration
Kitchen Extension Ideas
Back to Insights
Design & InspirationApril 2026⏱ 6 min
Kitchen Extension Ideas Creating the Perfect Open-Plan Home
The open-plan kitchen-diner is the most desired home feature in Britain. But getting it right requires more than removing a wall. Here is how to plan one that actually works — structurally, practically and beautifully.
Why open-plan works — and when it doesn’t
The appeal of the open-plan kitchen-diner is obvious: more light, more space, a social cooking environment and a seamless connection to the garden. But open-plan spaces also have real drawbacks — cooking smells travel throughout the house, noise from the kitchen disrupts living areas, and the heating demands of a large volume of space are greater than two smaller rooms. Getting the balance right is a design challenge, not just a structural one.
The four ways to create an open-plan kitchen
1. Knock through into the dining room
The simplest option: remove the wall between the existing kitchen and the room behind it. Costs start at £8,000–£15,000 including structural work, making good and redecoration. The result is limited by the existing footprint — you get a bigger, lighter space but not necessarily a transformative one.
2. Rear extension — the most popular choice
A single-storey rear extension adds a new kitchen-diner at the back of the house, typically with a glazed rear wall connecting to the garden. This is the most popular home improvement in London and for good reason: the transformation is dramatic, the ROI is proven and the build process is well-understood. Budget £55,000–£120,000 for a 25–40m² premium extension.
3. Side return infill — for terraced houses
Filling in the side return beside a Victorian terrace widens the existing kitchen dramatically without adding a large extension. Combined with a glazed lantern roof, this creates a bright, airy kitchen that feels far larger than its square footage suggests. Ideal for homeowners who want a significant transformation without a large build programme.
4. Wrap-around — the complete solution
Combining a side return infill with a rear extension creates a fully open-plan ground floor that wraps around the original back addition. This is the most expensive option (£90,000–£180,000) but delivers the most dramatic result: a continuous kitchen-dining-living space that opens fully to the garden.
“The best kitchen extensions aren’t designed around the kitchen — they’re designed around how the family actually lives.”
Glazing choices that define the space
Bifold doors fold back completely to open the full width to the garden. They create the best indoor-outdoor connection but can feel draughty if not well-specified. Budget £3,500–£12,000 depending on size and specification.
Sliding doors provide a cleaner sightline and better thermal performance than bifolds, with a more contemporary aesthetic. £4,000–£15,000.
Fixed glazing plus a door is the most affordable option and allows for the largest glass panels — maximising light while minimising cost.
Roof lanterns bring daylight into the centre of the extension — the part that fixed rear glazing can’t reach. Even a modest 1.5m x 1m lantern transforms a potentially dark extension into a light-filled room. Budget £2,500–£8,000.
Kitchen layout: the work triangle in an open-plan space
The “kitchen work triangle” (the triangle between sink, fridge and hob) applies regardless of how open the space is. In a larger extension, the bigger risk is an island that is too large for the room, or a peninsula that creates a bottleneck rather than a feature. Work with a kitchen designer as part of the extension design — not as an afterthought once the walls are up.
Ready to get started?
Book a free site survey
No obligation. Fixed-price quote within 5 working days. AQ Group serves London, Cambridge, Oxford and Herefordshire.
Related Articles
Continue reading
Pricing Guide
Rear Extension Cost London 2026
Extension Types
Side Return Extension
Advice & Guides
10 Questions to Ask Your Builder
Back to Insights
Project PlanningMarch 2026⏱ 5 min
How Long Does a House Extension Take? Realistic 2026 Timeline
From the first phone call to the final snagging inspection — here is exactly what to expect at every stage of a house extension, and how long each part realistically takes in 2026.
The total timeline for a house extension — summary
The total time from first contact with a contractor to moving back into your completed extension is typically 6–12 months for a standard rear extension. The build itself is only a fraction of this — planning, design and approvals take longer than most homeowners expect.
Typical Total Timeline (Rear Extension)
Site survey and quote: 1–2 weeks
Architect drawings: 3–6 weeks
Planning permission (if needed): 8–12 weeks
Building regulations approval: 4–6 weeks
Party wall agreement: 4–8 weeks (runs concurrently)
Construction start to completion: 10–20 weeks
Snagging and sign-off: 1–2 weeks
Stage 1: Survey and quote (1–2 weeks)
A thorough site survey should take 1–2 hours. The surveyor measures the existing house, assesses the ground conditions, reviews access and drainage, and discusses your brief. A detailed fixed-price quote should follow within 5 working days. If a contractor gives you a price on the phone or by WhatsApp, that is not a quote — it is a guess.
Stage 2: Design and approvals (8–20 weeks)
This is where most of the calendar time is spent — and it is almost entirely outside your contractor’s control. Architectural drawings take 3–6 weeks to produce. If planning permission is required, add 8 weeks for the application to be decided. Building regulations approval adds another 4–6 weeks (though this can often run concurrently with construction). Party wall notices must be served 2 months before work begins.
“Most delays happen before a single brick is laid. Clients who move quickly on surveys and drawings consistently finish months ahead of those who hesitate.”
Stage 3: Construction (10–24 weeks depending on type)
Single storey rear extensions take 10–14 weeks for standard builds, 12–16 weeks for premium specifications. Double storey additions take 16–24 weeks. Loft conversions take 8–14 weeks. Basements are the longest — 20–36 weeks depending on ground conditions and size.
Extension Type
Construction Time
Total Project Time
Single storey rear
10–16 weeks
5–8 months
Double storey rear
16–24 weeks
7–12 months
Loft conversion
8–14 weeks
5–8 months
Basement
20–36 weeks
10–18 months
Side return
8–14 weeks
5–8 months
Can I live in my house during the build?
For most rear and side return extensions, yes — with some disruption. The most difficult phase is the structural opening between the new extension and the existing house, which creates dust and noise for 2–5 days. Professional contractors dust-sheet and protect your home throughout the build, clear up at the end of every working day, and minimise disruption to utilities. Loft conversions are similarly liveable. Full renovations and basements are the exception — we generally advise decanting for these.
Ready to get started?
Book a free site survey
No obligation. Fixed-price quote within 5 working days. AQ Group serves London, Cambridge, Oxford and Herefordshire.
Related Articles
Continue reading
Pricing Guide
Rear Extension Cost London 2026
Pricing Guide
Loft Conversion Cost 2026
Planning & Regulations
Planning Permission for a Rear Extension
Back to Insights
Pricing GuideMarch 2026⏱ 8 min
Basement Conversion Cost 2026 Is It Worth It?
Basement conversions are the most complex — and often the most transformative — home improvement you can undertake. They are also expensive. Here is exactly what you get for your money, and when the numbers make sense.
How much does a basement conversion cost in 2026?
A basement conversion in London costs between £2,500 and £8,000 per m², making it the most expensive form of extension per square metre. A typical 40–60m² full dig-down basement in inner London costs £120,000–£400,000 completed. The range is wide because ground conditions, access, size and specification all vary enormously.
Cellar conversion vs full dig-down — what is the difference?
A cellar conversion works with an existing underground space. If your property already has a cellar, the structural work is significantly simpler — you are waterproofing and fitting out an existing volume rather than creating one. Costs are £30,000–£120,000 depending on condition and specification. The main limitation is headroom: many Victorian cellars have ceiling heights of 1.8–2.0m, which can feel low. Some cellar conversions include lowering the floor to gain headroom — this adds £15,000–£40,000 to the cost.
A full dig-down involves excavating the ground beneath an existing property that has no basement. This requires underpinning — temporarily transferring the building’s load while new foundations are constructed — and is the most structurally complex type of residential construction. It is expensive, it takes time (20–36 weeks), and it requires specialist engineers and contractors.
“In prime London postcodes, a well-designed basement adds more value than it costs to build. In outer London and the Home Counties, the calculation is closer. Always model the return before committing.”
Waterproofing — the make-or-break element
Basement waterproofing is the single most important technical decision in any basement project, and the area where the most failures occur. There are three BS 8102-compliant waterproofing approaches: Type A (tanking — applied membranes), Type B (structural concrete) and Type C (cavity drain membrane). Most competent basement contractors use a combination of B and C. The waterproofing system should carry a minimum 10-year insured guarantee. Be extremely wary of contractors who offer shorter guarantees or proprietary systems with limited track records.
Natural light in basements — your options
The most common objection to basement living spaces is the lack of natural light. But modern basements can be genuinely light-filled with the right design. Lightwells — excavated areas outside the basement windows — bring in daylight and can be designed as attractive garden features. Glass floors in the room above allow daylight to pass directly into the basement. Sun tubes can bring natural light from roof level down to basement rooms. AQ Group designs natural light solutions into every basement project from day one — not as an afterthought.
Is a basement conversion worth it?
In prime central London (Zones 1–2), yes — a well-executed basement almost always adds more value than it costs. In inner London, the equation is closer but generally positive. In outer London and the Home Counties, the ROI on basements is less predictable and depends heavily on the local property market and the quality of the execution. The decision should always be modelled against comparable local sales before committing to a dig-down.
Ready to get started?
Book a free site survey
No obligation. Fixed-price quote within 5 working days. AQ Group serves London, Cambridge, Oxford and Herefordshire.
Related Articles
Continue reading
Pricing Guide
Rear Extension Cost London 2026
Project Planning
How Long Does a House Extension Take?
Advice & Guides
10 Questions to Ask Your Builder
Back to Insights
Advice & GuidesFebruary 2026⏱ 5 min
10 Questions to Ask Your Builder Before Signing Anything
Most renovation disasters were predictable. The homeowner just did not ask the right questions before they handed over a deposit. Here are the ten questions that separate the good builders from the rest — and the red flags that should make you walk away.
Why vetting your builder matters more than choosing the cheapest quote
The average cost of a disputed or abandoned building project in the UK is £20,000–£45,000 according to the FMB. Most of these disputes involve contractors who were not properly vetted before work began. Asking the right questions before signing a contract takes 30 minutes. It could save you months of stress and tens of thousands of pounds.
The 10 questions — and what the answers tell you
1. “Can I see your public liability insurance certificate?”
Any legitimate contractor carries public liability insurance — minimum £1M, ideally £5M or £10M for larger projects. If they hesitate, make excuses or cannot produce a current certificate immediately, do not hire them. Full stop. An uninsured contractor leaves you personally liable for accidents on your property.
2. “Are you registered with any trade bodies?”
Checkatrade, MyBuilder, the Federation of Master Builders (FMB) and TrustMark all carry out background checks and require members to meet minimum standards. Membership does not guarantee quality — but absence of any accreditation is a yellow flag. Ask to see their profile and read the reviews.
3. “Can I speak to two or three previous clients?”
A confident, reputable contractor will give you references without hesitation. Call them. Ask specifically: did the project finish on time? Did the final cost match the quote? Were there any problems — and how were they handled? The last question is the most revealing.
“We actively encourage prospective clients to call our past clients. The conversations are our best sales tool — and they should be for any contractor worth hiring.”
4. “Is this a fixed-price quote or an estimate?”
These are very different things. An estimate is a guess that can change. A fixed-price quote is a legal commitment. If the quote says “estimate” or “approximate”, ask why. Legitimate contingencies should be identified and priced separately — not used as a blank cheque to charge more at the end.
5. “Who will be on site every day?”
Many contractors quote the job, then subcontract it out to someone cheaper and pocket the margin. Ask specifically who will be on site — their own directly employed tradespeople, or subcontractors? If subcontractors, ask who vets them and whether they are CIS registered.
6. “What is your payment schedule?”
A fair payment schedule is staged against progress: deposit on signing (10–20%), stages through the build tied to completed milestones, and a retention (5–10%) held until snagging is complete. Be wary of contractors who ask for large upfront payments —50% or more before any work begins is a major red flag.
7. “What does the contract cover if something goes wrong?”
Ask specifically about their guarantee on workmanship, how defects are handled, and what happens if they go out of business during the project. A reputable contractor will have clear answers. “That won’t happen” is not an answer.
8. “When can you start and when will you finish?”
Get specific dates in writing. A vague “we could probably start in a few weeks” suggests poor project management. A professional contractor works from a build programme with agreed start and completion dates, and notifies you immediately if anything changes.
9. “Who handles planning and building regulations?”
Do they manage the planning and building regulations process, or do they expect you to? A full-service contractor handles submissions, liaises with inspectors and ensures all sign-offs are obtained. If they say “you need to sort the planning”, factor in the additional time and cost of an architect.
10. “What happens at snagging?”
Snagging is the walk-through at the end of the project where you and the contractor identify anything that does not meet specification. Ask specifically: how long is the snagging period? When do they return to fix items? Is there a formal snagging list? Contractors who resist formal snagging processes are telling you something important.
Red Flags — Walk Away If You See These
No public liability insurance certificate available immediately
Wants 50%+ upfront before work begins
Cannot provide references or shows only testimonials on their own website
Quote arrives the same day as the site visit
No written contract — “we work on trust”
Significantly cheaper than every other quote (they have left something out)
Ready to get started?
Book a free site survey
No obligation. Fixed-price quote within 5 working days. AQ Group serves London, Cambridge, Oxford and Herefordshire.
Related Articles
Continue reading
Pricing Guide
Rear Extension Cost London 2026
Project Planning
How Long Does a House Extension Take?
Planning & Regulations
Planning Permission for a Rear Extension
Back to Services
Complete Process GuideUpdated June 2026⏱ 10 min read
Planning, Permissions & Building Approvals
Everything that happens before a single brick is laid — planning permission, permitted development, building regulations, architectural drawings, structural engineers and construction timelines. Your complete guide.
Permitted Dev
Planning Permission
Building Regs
Architecture
Timeline
Where to Start
The approvals you need before you can build
Before any extension project can begin on site, a number of legal approvals must be in place. Understanding which ones apply to your project — and in which order to obtain them — saves months of delays and thousands in abortive costs.
AQ Group manages the entire pre-build process for every client: surveys, architect drawings, planning applications, building regulations, party wall notices and structural engineer sign-off. You deal with one point of contact from concept to completion.
01
Permitted Development Rights
Can you build without a planning application?
→
02
Planning Permission
Full application — when required and how it works
→
03
Building Regulations
Structural, fire, energy and accessibility standards
→
04
Party Wall Act
Neighbour agreements and legal notices
→
05
Architectural Drawings
What plans you need and who produces them
→
06
Structural Engineer
Calculations, steelwork and sign-off
→
07
Full Project Timeline
From first call to completed build
→
Step 01
Permitted Development Rights
Most homeowners can extend their home without a full planning application — but the rules are specific and the limits are firm. Understanding them properly is the first step.
Permitted Development Limits — Single Storey Rear
Detached house: Up to 8m from original rear wall
Semi-detached / terraced: Up to 6m from original rear wall
Maximum height: 4m (3m if within 2m of boundary)
Flat roof maximum: 3m height
Total footprint: Cannot exceed 50% of original garden
Materials: Must be similar to the existing house
Position: Not forward of the principal elevation
Permitted Development Limits — Double Storey
Maximum depth: 3m from original rear wall
Rear boundary clearance: At least 7m
Maximum height: Same as existing dwelling
Roof pitch: Must match existing
Windows: No upper-floor side windows overlooking neighbours
Not permitted within 2m of a boundary
Balconies: Not permitted under PD
✓
Permitted Development Applies If…
You live in a house (not flat or maisonette)
The property has not been converted from commercial use
No PD rights have been removed by Article 4
You are not in a Conservation Area (for most PD rights)
The property is not Listed
Previous extensions haven’t used up your allowance
⚠
Always Check If…
You are in a Conservation Area
Your street has an Article 4 Direction (check LPA website)
Your property is near a National Park or AONB
The house was originally built as commercial premises
Previous extensions have been built on the property
✗
Always Need Planning Permission
Listed Buildings — any works require Listed Building Consent
Flats and maisonettes — no PD rights
Exceeding the size limits above
Extensions on the front or side elevation
Adding a balcony, raised platform or veranda
“We recommend a Lawful Development Certificate (LDC) for all PD projects. It costs £103–£206 and takes 8 weeks — but it protects your investment when you come to sell, and prevents disputes with neighbours or future buyers’ solicitors.”
Step 02
Planning Permission
When Permitted Development does not apply, a full planning application is required. The process is well-defined — and with experienced professionals managing it, approval on first submission is the norm, not the exception.
1
Pre-Application Advice
Optional but recommended for complex projects. Meet with the Local Planning Authority to understand their likely approach before submitting. £100–£300 fee. 2–4 weeks.
2
Architect Drawings
Full architectural drawings are prepared: existing and proposed plans, elevations and sections, site plan and location plan. 3–6 weeks.
3
Application Submission
Application submitted to the Local Planning Authority with drawings, design & access statement, and fee (£206 for a householder application). AQ Group manages this entirely.
4
Decision
Most householder applications are decided in 8 weeks. Approval comes with conditions (e.g. approved materials). We liaise with the planning officer throughout to maximise approval chances.
Impact on the character and appearance of the area
Effect on neighbouring amenity (light, privacy, outlook)
Relationship to the existing dwelling
Materials and design quality
Parking and access implications
Trees, ecology and drainage
Step 03
Building Regulations
Planning permission is about whether you can build. Building regulations are about how you build — the technical standards for structure, fire safety, insulation, drainage and accessibility that every extension must meet.
■
Structure (Part A)
Foundations, structural frame, roof structure and load-bearing elements must be designed by a qualified structural engineer and inspected by Building Control at key stages.
■
Fire Safety (Parts B & J)
Means of escape, fire-resistant construction, smoke detection, heating appliances. Extensions must not impair the escape route from upper floors.
■
Moisture (Part C)
Damp-proof courses, ground preparation, cavity wall construction and drainage design must prevent moisture entering the habitable space.
■
Insulation & Energy (Part L)
Post-2021 regulations are significantly stricter. Wall, roof and floor insulation values, glazing U-values and overheating calculations are all assessed. Most extensions now require an SAP or SBEM calculation.
■
Drainage (Part H)
Any extension affecting existing drainage routes — or adding new kitchen or bathroom facilities — must connect correctly to foul and surface water drainage systems.
■
Electrics & Plumbing (Parts P & G)
All electrical work in extensions must be Part P certified. New plumbing must comply with Water Regulations and Building Regulations Part G for hot water and sanitation systems.
“Building Control inspects at critical stages — foundations, frame, insulation, drains and completion. Every inspection must be passed before the next stage proceeds. Our directly employed team builds to the standard required first time.”
Building Regulations: Full Approval vs Building Notice
Full Plans approval: Detailed drawings submitted before work starts. Building Control reviews and approves the technical design. More upfront work, but complete certainty before you dig. Recommended for all extensions.
Building Notice: Simpler notification without full drawings. Suitable only for smaller, straightforward projects. Building Control inspect as you build. Less upfront certainty — changes may be required on site.
AQ Group approach: We always submit Full Plans for extensions. It costs slightly more in upfront fees but eliminates on-site surprises and ensures the Completion Certificate — essential for property sales — is issued without complications.
Step 04
The Party Wall Act 1996
The Party Wall Act protects both you and your neighbours when building work affects a shared wall, boundary or foundations near a neighbouring property. Understanding it prevents disputes and delays.
📄
When Party Wall Notices Apply
Building on or at the boundary line
Excavating within 3m of neighbour’s foundations deeper than their foundations
Excavating within 6m if deeper than 45° line from their foundations
Any work to a shared (party) wall
Most side return and basement extensions
Rear extensions close to the boundary
📋
The Notice Process
Written notice served on all adjoining owners
Neighbours have 14 days to respond
If they consent: work can proceed after 14 days
If they dissent or do not respond: a Party Wall Award is produced by surveyors
The Award governs how the work is carried out
Work cannot begin for 2 months after notice
💰
Party Wall Costs
Agreed surveyor (one surveyor, both agree): £700–£1,200
Two surveyors (each party appoints one): £1,500–£3,000+
Who pays: The building owner (you) pays both surveyors’ fees
AQ Group: We serve all notices and manage the process on your behalf — included in our service
Step 05
Architectural Drawings
Good architectural drawings are the foundation of a successful project. They communicate your vision to the planning authority, the building inspector, the structural engineer and the construction team — preventing costly misunderstandings at every stage.
Planning drawings
These are the drawings submitted with your planning application. They show the Local Planning Authority what you intend to build — not how you intend to build it. They include:
Location plan (1:1250 or 1:2500 — shows the site in context)
Site plan (1:500 — shows the property boundaries)
Existing floor plans (1:100 — as the building is now)
Proposed floor plans (1:100 — how it will look after)
Existing and proposed elevations (all affected facades)
Design & Access Statement (for some applications)
Building regulations drawings
These are more detailed technical drawings submitted to Building Control. They show how the extension will be built to meet all regulatory requirements. They include:
Detailed floor plans with dimensions and materials
Planning drawings only (simple extension): £1,200–£2,500
Planning + building regs (rear extension): £2,000–£4,500
Loft conversion (planning + regs): £2,500–£5,500
Basement (all drawings): £4,000–£9,000
Full renovation with reconfig: £3,500–£8,000
What AQ Group Provides
All planning and building regulations drawings produced in-house or via our trusted architect partners
3D visualisations of your finished extension on request
All submitted and managed as part of our project service
Structural engineer drawings coordinated by our in-house engineers
Single point of contact throughout — no chasing multiple professionals
Step 06
The Structural Engineer
Every extension requires a structural engineer. They design the load-bearing elements — foundations, steel beams, roof structure — and produce the calculations that Building Control requires before they approve the build.
⚙️
What they design
Foundation type and depth for your specific soil conditions
Steel beam sizes for structural openings
Roof structure and timber sizing
Floor joist specification (especially lofts)
Underpinning design (basements)
Any temporary works required during construction
📋
What they produce
Structural calculations report
Foundation drawings
Steel beam schedule and connection details
Roof and floor structural drawings
Site inspection sign-off at key stages
Building Control submission package
💰
Cost & timing
Rear extension: £800–£1,800
Loft conversion: £1,000–£2,200
Basement: £3,000–£8,000
Lead time: 2–4 weeks typically
AQ Group: Structural engineers are part of our in-house team — no separate appointment needed
Step 07
Complete Project Timeline
From the first conversation to moving into your completed extension — here is the realistic, honest timeline for the most common project types in 2026.
Building regs drawings + structural calcs4–6 weeks
Full Plans approval4–6 weeks
Construction on site12–20 weeks
Snagging & completion certificate1–2 weeks
Total from first call8–12 months
Basement Conversion — Full Dig-Down
Structural survey & quote2–3 weeks
Architect & structural drawings6–10 weeks
↰ Party wall (almost always required)8–12 weeks
Planning application8–16 weeks
Building regulations Full Plans4–8 weeks
Construction on site20–36 weeks
Waterproofing warranty & sign-off2–3 weeks
Total from first call12–20 months
“The homeowners who start quickly are always the ones who finish earliest. Every week of hesitation at the beginning adds a week to your completion date. If you are serious about building in 2026, the time to start is now.”
Common Questions
Planning & approvals questions answered
Can I start building while my planning application is being decided?
No. You must wait for a planning decision before starting any work that requires permission. Starting before permission is granted is an enforcement risk and could result in a requirement to demolish the work. The only exception is if you have confirmed the work falls under Permitted Development — in which case no planning application is needed at all.
What happens if my planning application is refused?
You have the right to appeal to the Planning Inspectorate within 12 weeks of refusal. Appeals take 3–6 months. Alternatively, you can revise the design to address the planning officer’s objections and resubmit. Pre-application advice from the LPA — which we recommend for any project in a sensitive location — significantly reduces the risk of refusal on first submission.
Do I need building regulations approval even for Permitted Development?
Yes — almost always. Permitted Development rights concern planning law only — whether you are allowed to build the extension. Building regulations are entirely separate and apply regardless of whether planning permission was required. The only very minor works that are exempt from building regulations are things like garden sheds and small porches under a specific size.
What is a Completion Certificate and why do I need it?
A Completion Certificate is issued by Building Control at the end of a project to confirm that the work was carried out in accordance with the approved building regulations drawings. It is the proof that your extension was built to the required legal standards. Without it, you may face difficulties selling your property, obtaining mortgage finance on it, or making an insurance claim. AQ Group ensures every project receives its Completion Certificate as part of our standard process.
My neighbour has threatened to object to my extension. Can they stop it?
Under Permitted Development: no. A neighbour cannot veto Permitted Development rights. They may require a Party Wall Award (which governs how the work is done) but cannot prevent the extension being built. Under planning permission: neighbours can submit objections, but planning decisions are made on planning merit — not personal preference. A neighbour objecting that they “don’t want it” carries very little weight. Legitimate planning objections about loss of light, overlooking or overbearing impact may have more effect.
Does AQ Group handle all of this for me?
Yes — completely. From the initial feasibility survey through to the Completion Certificate, AQ Group manages every approval, every application and every inspection. You deal with one project manager throughout. We submit planning applications, liaise with Building Control at every inspection stage, serve party wall notices, manage neighbour consultations and obtain all sign-offs. You do not need to engage an architect, structural engineer or party wall surveyor separately — we coordinate all of these as part of our project service.
We Handle Everything
Let us manage every approval for your project
From permitted development confirmation to building regulations sign-off — AQ Group manages the entire pre-build process across London, Cambridge, Oxford and Herefordshire.